Archive // Documentary evidence
Archive
Contextual records from field deployments, laboratory construction, exhibitions, awards, and research evidence — each linked back to the work and laboratories it documents.
17 records · Project
Loading filters…
LOG.001DEPOT — MULTIMODAL LOCOMOTIVE SCAN — NYU Abu Dhabi · CAIR with Etihad Rail
Spot beside an Etihad Rail locomotive inside the depot hangar, collecting multimodal inspection data for predictive maintenance
Etihad Rail × NYUAD AI & Robotics Collaboration →ARCHIVE LOG.001
DEPOT — MULTIMODAL LOCOMOTIVE SCAN
2024 · Project
LOG.002TRACKSIDE — DATA FOR PREDICTIVE MAINT. — NYU Abu Dhabi · CAIR with Etihad Rail
Spot on railway tracks facing the Etihad Rail depot, gathering multimodal data for locomotive predictive maintenance analysis
Etihad Rail × NYUAD AI & Robotics Collaboration →ARCHIVE LOG.002
TRACKSIDE — DATA FOR PREDICTIVE MAINT.
2024 · Project
LOG.003YARD — SPOT MULTIMODAL COLLECTION — NYU Abu Dhabi · CAIR with Etihad Rail
Spot in the Etihad Rail yard between freight tracks, supporting multimodal data collection for further analysis and predictive maintenance
Etihad Rail × NYUAD AI & Robotics Collaboration →ARCHIVE LOG.003
YARD — SPOT MULTIMODAL COLLECTION
2024 · Project
LOG.004FIELD CREW — TRAIN SENSOR INSTALL — NYU Abu Dhabi · SMART Lab with Etihad Rail
Three engineers in PPE on the rear platform of an Etihad Rail locomotive with a LiDAR and camera sensing payload mounted on the handrail
Digital Twin-Based Desert Environment Monitoring for Rail Tracks →ARCHIVE LOG.004
FIELD CREW — TRAIN SENSOR INSTALL
2024 · Project
Digital Twin-Based Desert Environment Monitoring for Rail Tracks →
LOG.005LIDAR · CAMERA — REAR HANDRAIL MOUNT — NYU Abu Dhabi · SMART Lab with Etihad Rail
Close-up of LiDAR and camera sensors bracketed to the train rear handrail, with an Etihad Rail service vehicle beside the tracks
Digital Twin-Based Desert Environment Monitoring for Rail Tracks →ARCHIVE LOG.005
LIDAR · CAMERA — REAR HANDRAIL MOUNT
2024 · Project
Digital Twin-Based Desert Environment Monitoring for Rail Tracks →
LOG.006INSTRUMENTED CHAIR — SENSOR & GAZE RIG — NYU Abu Dhabi · with University of Ottawa · 2013–2016
Instrumented powered wheelchair prototype with a custom sensor and gaze-tracking frame, in a lab corridor
Eye-Gaze-Controlled Wheelchair →LOG.007LAB BENCH — FULL SAMPLE CAMPAIGN — NYU Abu Dhabi · Panče Naumov research group / Design Studio · 2016–2017
Laboratory workbench covered with pink ribbon curl samples arranged by test condition under a task light
Ribbon Curler — Automated Research Instrumentation →ARCHIVE LOG.007
LAB BENCH — FULL SAMPLE CAMPAIGN
2016 · Project
LOG.008CURL SAMPLES — BY TEST CONDITION — NYU Abu Dhabi · Panče Naumov research group / Design Studio · 2016–2017
Drawer tray of pink ribbon curls with handwritten notes for weight, speed, width, and fixture geometry
Ribbon Curler — Automated Research Instrumentation →ARCHIVE LOG.008
CURL SAMPLES — BY TEST CONDITION
2016 · Project
LOG.009MOUNTING ANGLE — LEFT VS RIGHT — NYU Abu Dhabi · Panče Naumov research group / Design Studio · 2016–2017
Annotated sheets comparing left and right blade mounting angles with corresponding ribbon curl samples
Ribbon Curler — Automated Research Instrumentation →ARCHIVE LOG.009
MOUNTING ANGLE — LEFT VS RIGHT
2016 · Project
LOG.010SPEED SWEEP — SPIRAL RESPONSE — NYU Abu Dhabi · Panče Naumov research group / Design Studio · 2016–2017
Ribbon curl samples arranged by pull speed from 1 mm/s to 150 mm/s showing increasing spiral radius
Ribbon Curler — Automated Research Instrumentation →ARCHIVE LOG.010
SPEED SWEEP — SPIRAL RESPONSE
2016 · Project
LOG.011GEOMETRY — CURL & TWIST STATES — NYU Abu Dhabi · Panče Naumov research group / Design Studio · 2016–2017
Ribbon curl and twist variations with trigonometric fixture sketches for different geometric conditions
Ribbon Curler — Automated Research Instrumentation →ARCHIVE LOG.011
GEOMETRY — CURL & TWIST STATES
2016 · Project
LOG.012SOP-28 SOCKET — LOCKED PROCESSOR UNDER TEST — NYU Abu Dhabi · with Ozgur Sinanoglu's hardware-security group
Close-up of the populated chip-test PCB showing the SOP-28 test socket, DIP switch block, and illuminated seven-segment display
Hardware-Security ASIC Validation Platform →ARCHIVE LOG.012
SOP-28 SOCKET — LOCKED PROCESSOR UNDER TEST
2017 · Project